top of page
m_IMG_3491 (1)_edited_edited.jpg

The Process

The Custom Building Process 
The Process in detail

1. Seeking Finance

Seeking finance before starting the building process is a crucial step to ensure you have the necessary funds in place to complete the project. Here are the steps to follow when seeking finance and setting a budget for your construction project:

 

Assess Your Financial Situation:

  • Evaluate your current financial standing, including savings, assets, income, and liabilities.

  • Determine how much you can realistically allocate towards the construction project without compromising your financial stability.

​

Research Lenders and Loan Options:

  • Explore different lenders, such as banks, credit unions, and mortgage brokers, to compare loan options and interest rates.

  • Consider various types of loans, such as construction loans, home equity loans, or personal loans, depending on your needs and eligibility.

 

Get Pre-Approval:

  • Apply for pre-approval with your chosen lender to determine the maximum loan amount you qualify for based on your financial information and creditworthiness.

  • Pre-approval gives you a clear idea of your budget and helps streamline the financing process once you're ready to proceed with the construction project.

 

Set a Realistic Budget:

  • Based on your pre-approved loan amount and financial assessment, establish a realistic budget for the construction project.

  • Factor in all anticipated costs, including land acquisition (if applicable), design and engineering fees, permits, construction materials, labour, contingencies, and post-construction expenses.

 

Allocate Funds Wisely:

  • Allocate funds within your budget for different project phases, such as design, pre-construction, construction, and post-construction activities.

  • Prioritise essential elements while being mindful of cost-saving opportunities and potential areas where adjustments can be made without compromising quality or safety.

 

Review and Revise as Needed:

  • Regularly review and revise your budget as the project progresses, considering any changes in costs, scope, or timeline.

  • Communicate openly with your builder, architect, and financial advisor to ensure alignment between your budget, financing, and project goals.

 

By following these steps, you can secure financing effectively, set a realistic budget, and manage your construction project efficiently to achieve your desired outcomes within financial constraints.
 

2. Initial Consultation and Design

Initial Consultation and Design: This is where the client discusses their requirements, budget, and preferences with the builder/architect. Initial designs and plans are created based on this information. The builder will meet onsite to get a feel for the job once you have plans initiated.

3. Permits and Approvals

Permits and Approvals: Once the design is finalised, the builder obtains necessary permits and approvals from the potential client. For permits and approvals in the building process, you'll typically need to provide the builder with the following:

​

  • Finalised Plans from an Architect/Engineer: Detailed architectural and engineering plans are required to ensure that the building meets structural, safety, and design standards.

  • BASIX Certificate: BASIX (Building Sustainability Index) is a mandatory assessment for residential building projects in New South Wales, Australia, focusing on energy efficiency and water savings. A BASIX certificate demonstrates compliance with sustainability requirements.

  • Development Application (DA) or Complying Development Certificate (CDC) Approvals: Depending on the complexity and nature of the project, you'll need either a DA or CDC approval from the local council or a private certifier.

​

Development Application (DA): Required for more complex or larger-scale projects that don't meet the criteria for CDC. It involves a detailed assessment of the proposed development against local planning regulations and may require public notification and input. 
 
Complying Development Certificate (CDC): Suitable for straightforward, low-risk developments that comply with specific criteria outlined in the State Environmental Planning Policy (SEPP). CDC approvals are faster than DAs but have strict eligibility requirements.

Working with professionals like architects, engineers, and certifiers is crucial to ensure that your plans meet all regulatory requirements and are approved smoothly before you work with a builder.
 

4. Choosing PC (Prime Cost) items

Choosing PC (Prime Cost) items: These need to suit your style and budget. They can either be self-selected, an allowance can be made by your builder or you can personally select items with an interior designer. 
Here's how the process typically works:

​

  • Initial Consultation: Start by discussing your design preferences, style, budget, and specific requirements with your interior designer. This helps them understand your vision and tailor their recommendations accordingly. Mood boards will be created collaboratively for your vision.

  • Selection of PC Items: PC items refer to items such as fixtures, fittings, appliances, and materials that are included in the overall budget. These items can have a significant impact on the aesthetics and functionality of your space.

  • Guidance and Suggestions: Your interior designer will provide guidance and suggestions based on your preferences and budget constraints. They can recommend options that align with your style while ensuring quality and functionality.

  • Review and Approval: The designer presents various PC item options for your review and approval. This may include samples, specifications, and pricing details to help you make informed decisions.

  • Collaborative Decision-Making: Collaborate closely with your interior designer during the selection process. Provide feedback, ask questions, and express any concerns to ensure the chosen PC items meet your expectations.

  • Budget Management: Your designer will help manage the budget by providing cost estimates for different PC items and suggesting alternatives if needed to stay within budget constraints.

  • Procurement and Installation: Once PC items are finalised, the designer handles the procurement process, including ordering, delivery coordination, and installation, ensuring everything is executed according to the agreed-upon design plan.

  • Quality Assurance: Your designer and builder oversee the quality of PC items and ensures they meet the required standards before installation, maintaining the overall design integrity. Warranties are ensured for PC items that are purchased through BK Constructions PTY LTD, otherwise liability falls to the client and their supplier.

​

By working closely with your interior designer and actively participating in the selection of PC items, you can achieve a space that reflects your style, meets your functional needs, and stays within your budget. BK Constructions offers flexibility in this area to achieve a custom-build home.
 

5. Signing contracts

Signing contracts for construction projects: The two common types are Cost-Plus contracts and BC4 (Building and Construction Industry Security of Payment Act 1999) contracts.


Here's a brief overview of each:
Cost-Plus Contract: A Cost-Plus contract through Master Builders NSW is a type of construction contract where the client agrees to pay the actual costs of construction, including materials, labour, and other expenses, plus a predetermined fee or percentage for the builder's profit and overhead. Here's an overview of how a Cost-Plus contract through Master Builders NSW typically works:

​

Contract Agreement:

  • The client and the builder enter into a Cost-Plus contract agreement, which outlines the terms, conditions, and payment structure for the construction project.

  • The contract may specify the builder's fee as a percentage of the total project cost or a fixed fee.

​​

Cost Tracking:

  • Throughout the project, the builder tracks and documents all costs incurred, including materials, subcontractor fees, labour, equipment rentals, permits, and other expenses.

  • Detailed records are maintained to ensure transparency and accuracy in cost reporting.

​

Regular Reporting:

  • The builder provides regular reports to the client, detailing the actual costs incurred to date and projecting future expenses based on the project's progress.

  • These reports help the client stay informed about budgetary matters and make informed decisions regarding project scope and expenditures.

​

Fee Calculation:

  • The builder's fee, also known as the "plus" component of the Cost-Plus contract, is calculated based on the total actual costs of construction.

  • This fee can be a percentage of the total project cost (e.g., 10% of actual costs) or a fixed amount agreed upon in the contract.

​

Transparent Billing:

  • The builder submits transparent and itemised invoices to the client, clearly delineating each cost category and the associated expenses.

  • Clients have visibility into the breakdown of costs, ensuring accountability and facilitating cost management.

​

Change Orders and Variations:

  • If there are changes or variations to the project scope during construction, such as design changes or additional work requests, they are documented through change orders.

  • The Cost-Plus contract allows for flexibility in accommodating changes, with adjustments made to the budget and fee accordingly.

​

Project Completion and Final Accounting:

  • Upon project completion, the builder provides a final account statement to the client, summarising all costs, fees, and adjustments made throughout the construction process.

  • Any remaining funds from the client's initial budget allocation, after deducting actual costs and fees, are reconciled, and finalised.

​

It's important for both parties to have a clear understanding of the Cost-Plus contract terms, including the fee structure, cost tracking methods, reporting frequency, and procedures for handling changes or variations. Working with reputable organisations like Master Builders NSW can provide guidance and support in navigating Cost Plus contracts effectively.


BC4 Contracts: A BC4 contract with Master Builders NSW refers to a specific type of construction contract governed by the Building and Construction Industry Security of Payment Act 1999 (NSW) and administered by Master Builders NSW. 
Here's an overview of what a BC4 contract entails when working with Master Builders NSW:

​

Legal Framework:

  • The BC4 contract is based on the provisions of the Building and Construction Industry Security of Payment Act 1999 (NSW), which establishes a framework for timely and fair payments in the construction industry.

  • Master Builders NSW provides BC4 contracts that comply with the legal requirements outlined in the Act.

​

Payment Schedule:

  • Under a BC4 contract, progress payments are made at regular intervals based on the completion of specified stages or milestones in the construction project.

  • The contract defines the payment schedule, including the timing of payments and the percentage of work completion required to trigger each payment.

​

Payment Claims and Schedules:

  • Contractors submit payment claims to the client, detailing the work performed, materials supplied, and any variations or additional costs incurred.

  • Upon receiving a payment claim, the client must respond with a payment schedule within a specified timeframe, indicating the amount they propose to pay and any reasons for withholding or adjusting payment.

​

Dispute Resolution:

  • The BC4 contract includes mechanisms for resolving payment disputes between parties, such as adjudication, mediation, or arbitration, as provided for under the Security of Payment Act.

  • In case of payment disputes, parties can seek timely resolution through the prescribed dispute resolution processes outlined in the contract and the Act.

​

Compliance and Enforcement:

  • Both parties must adhere to the contractual obligations and procedural requirements set forth in the BC4 contract and the Security of Payment Act.

  • Non-compliance with payment obligations or dispute resolution procedures may result in penalties, enforcement actions, or legal proceedings as per the Act's provisions.

​

Master Builders NSW Support:

  • Working with Master Builders NSW provides access to expert guidance, resources, and support in implementing BC4 contracts effectively.

  • Master Builders NSW can assist with contract drafting, compliance with legal requirements, dispute resolution assistance, and overall contract management.

​

When entering a BC4 contract with Master Builders NSW, it's essential to understand the contractual terms, payment procedures, dispute resolution mechanisms, and legal obligations to ensure a smooth and compliant construction process. Consulting with your builder can provide valuable insights and ensure that the BC4 contract is tailored to meet your specific project needs and requirements.

​

Choosing between BC4 and Cost-Plus contracts depends on factors such as project complexity, budget certainty, payment preferences, and risk tolerance. Consulting with the builder can help determine the most suitable contract type for your specific project. 


Once a contract is signed by both parties, the constructions process is underway. 
 

​

Final Stages

6. Site Preparation: This includes clearing the land, leveling, and preparing it for construction.

​

7. Foundation: The foundation is laid, providing the structural support for the building.

​

8. Construction: This phase involves building the structure, including walls, floors, roof, and other elements as per the approved plans.

​

9. Utilities Installation: Plumbing, electrical, heating, ventilation, and air conditioning systems are installed.

​

10. Interior Finishes: This includes installing fixtures, cabinetry, flooring, painting, and other interior details.

​

11. Exterior Finishes: Exterior siding, roofing, landscaping, and any other external finishes are completed.

​

12. Final Inspections: Local authorities conduct inspections to ensure compliance with building codes and regulations.

​

13. Handover: The completed building is handed over to the client after final checks and inspections.

Traditional elegance to modern sophistication

ABN  826 4366 3469

Builders Licence 3596 12C

bottom of page